Weekend construction: I-285, lane closures near I-85, GA 400 - CBS46 News

Weekend construction: I-285, lane closures near I-85, GA 400 interchange project

Posted: Updated:
ATLANTA (CBS ATLANTA) -

On Interstate 285, GDOT maintenance crews will be replacing concrete slabs requiring double right lane closures in both directions from 9 p.m. until 5 a.m. each night from Sept. 13 to Sept. 16.

The closures will be southbound from Cascade Road to Langford Parkway and northbound from Hollowell Parkway to South Cobb Drive.

Motorists traveling around the Sidney Marcus Boulevard, Cheshire Bridge Road, Lenox Road, Buford Highway area should be aware that many of the surface streets in that area will have lane closures for work related to the State Route 400 and Interstate 85 Interchange Project.

Additionally, single lane closures will be in place in various locations around I-285, on Interstate 75 and on Interstate 20 for drain cleaning, shoulder sweeping and sign upgrades.

Copyright 2013 WGCL-TV (Meredith Corporation). All rights reserved.


Powered by WorldNow
CBS Atlanta
Powered by WorldNow
All content © 2000-2014 WorldNow and WGCL-TV. All Rights Reserved. For more information on this site, please read our Privacy Policy and Terms of Service.